This recommended practice defines the principles and procedures for starting up, normal operation, shutting down, daily operation and maintenance during normal and emergency conditions for 300 MW to 600 MW pulverized coal fired boiler and its main auxiliary equipment. This recommended practice applies to 300 MW to 600 MW pulverized coal fired boiler. For specific applications, an additional document needs to be formulated by the users based on this recommended practice to cover detailed procedures or normally so called operation code, together with the instructions of manufactures and experiences derived from normal operation practice.
Abstract
New IEEE Standard - Active - Draft.This document gives general technical recommended practice for operation of the pulverized coal fired boiler in power plants, including startup, shutdown, operation and maintenance, emergence and failure detecting/handling and preventing. This document is applicable to boiler of existing single units with a capacity of 300 MW to 600 MW in thermal power plants, where pulverized coal is combusted to generate electricity and/or to supply heat meanwhile. This document can be used to develop boiler operation code as reference to determine detail operation steps and/or procedures for particular boiler of the plant. Specifications of manufacturer, good experiences from practice and stipulation defined in other related high-level standards/regulations/code should also be matched.
Product Details
ISBN(s): 9781504471961 Number of Pages: 75 File Size: 1 file , 660 KB Product Code(s): STDUD24487
M00001308
2021-02-20
New product
IEEE P2777
IEEE Draft Recommended Practice for Operation of 300 MW to 600 MW Pulverized Coal Fired Boiler