• -55%
  • New

IEC 61850-4 Ed. 2.0 b:2011

$235.00
$105.75 Save 55%

IEC 61850-4 Ed. 2.0 b:2011 Communication networks and systems for power utility automation - Part 4: System and project management

standard by International Electrotechnical Commission, 04/11/2011

Quantity
In stock

Full Description

IEC 61850-4:2011 applies to projects associated with process near automation systems of power utilities (UAS, utility automation system), like e.g. substation automation systems (SAS). It defines the system and project management for UAS systems with communication between intelligent electronic devices (IEDs) in the substation respective plant and the related system requirements. This second edition constitutes a technical revision to align the document more closely with the other parts of the IEC 61850 series, in addition to enlarging the scope from substation automation systems to all utility automation systems.

M00007481
2021-02-22
New product