This part of IEC TS 62600 is concerned with the sub-prototype scale development of WECs. It includes the wave tank test programmes, where wave conditions are controlled so they can be scheduled, and the first large-scale sea trials, where sea states occur naturally and the programmes are adjusted and flexible to accommodate the conditions. A full-scale prototype test schedule is not covered in this document. Bench tests of PTO (power take-off) equipment are also not covered in this document.