BS PD CLC/TS 61400-26-2:2017 provides a framework from which production-based performanceindicators of a WTGS (wind turbine generator system) can be derived. It unambiguouslydescribes how data is categorised and provides examples of how the data can be used toderive performance indicators.
The approach of this part of IEC 61400 is to expand the time allocation model, introduced inIEC TS 61400-26-1, with two additional layers for recording of the actual energy productionand potential energy production associated with the concurrent time allocation.
It is not the intention of this Technical Specification to define how production-basedavailability shall be calculated. Nor is it the intention to form the basis for power curveperformance measurements, which is the objective of IEC 61400-12.
Cross References: CLC/TS 61400-26-1:2017 IEC TS 61400-26-1:2011 IEC 60050 IEC 61400-25-5:2006 IEEE 762:2006 IEC 61400-12-1:2005 IEC 61400-1:2005 IEC 61400-25-3:2006 IEC 61400-25-2:2006 IEC 61400-25-1:2006 IEC 61400-25-4:2008 IEC 61400-25-6:2010 EN 61400-25-4 (IEC 61400-25-4:2016)AS EN 61400-25-6:2017 EN 61400-25-3 (IEC 61400-25-3:2015)AS EN 61400-25-5 (IEC 61400-25-5:2006)AS EN 61400-1 (IEC 61400-1:2005) AS ISO 3977-9:1999 IEC 61400-12-2:2013 EN 61400-12-1:2017 EN 61400-12-2 (IEC 61400-12-2:2013) AS EN 61400-25-1 (IEC 61400-25-1:2006)AS EN 61400-25-2 (IEC 61400-25-2:2015)AS
All current amendments available at time of purchase are included with the purchase of this document.
Product Details
Published: 10/26/2017 ISBN(s): 9780580977329 Number of Pages: 51 File Size: 1 file , 1.2 MB Product Code(s): 30357194, 30357194, 30357194