• -55%
  • New

ASME B30.18-1998

$145.00
$65.25 Save 55%

ASME B30.18-1998 Stacker Cranes (Top or Under Running Bridge, Multiple Girder with Top or Under Running Trolley Hoist)

standard by ASME International, 01/01/1998

Quantity
In stock

Full Description

Applies to the construction, installation, operation, inspection and maintenance of overhead and gantry stacker cranes with top running or under running bridge, multiple girder. The vertical mast for guiding the carriage is attached to the top running or under running trolley. These cranes are grouped because they all have the same features in vertically guiding the lifted load. Stacker cranes in this grouping include semi-gantry, cantilever gantry, and others having the same fundamental characteristics.

M00006370
2021-02-22
New product