• -55%
  • New

AASHTO GSDPB-2-I1

$150.00
$67.50 Save 55%

AASHTO GSDPB-2-I1 AASHTO 2015 Interim Revisions to LRFD Guide Specifications for the Design of Pedestrian Bridges, 2015 Interim Revisions

Amendment by American Association of State and Highway Transportation Officials, 2014

Quantity
In stock

Full Description

The 2015 interim revision contains updated information to the LRFD Guide Specifications for Design of Pedestrian Bridges, 2nd Edition. It is necessary to have this interim to have all current specification information.

M00001647
2021-03-02
New product